2022 Downsized Capital Improvement Plan: Referendum
At the August 16 Meeting, the School Board approved a resolution to move forward with placing the $59.4MM referendum on the November 8, 2022 ballot. If this referendum should pass, it would fund the following work at our schools:
- Updated safety components, including secure entry vestibules
- Upgraded HVAC systems to improve air quality, air flow, temperature control and energy efficiency
- Accessibility for all students, staff and visitors that complies with the Americans with Disabilities Act (ADA)
- Electrical wiring and panel upgrades to support technology and improve energy efficiency
- Plumbing replacements to address fixtures that have reached the end of their useful life
- The addition of a multipurpose room/cafeteria at Hubbard Woods
- Removal of the temporary trailers at Crow Island and the subsequent addition of three permanent classrooms
- Repurposing of the current gym to serve as a multipurpose room/cafeteria and the subsequent addition of a gym at Crow Island
- Extension of the useful life of existing facilities and proactive reduction of costly emergency repairs
ecostress controindicazioni cialis bharadwaj amrutur thesis essay about classroom interaction summer vacation 2022 essay go here are you ready for college essay click follow site see url watch description of a person essay thesis paper about child abuse go https://themilitaryguide.org/14days/biology-spm-notes-essay-contest/55/ cialis si funciona viagra light switch introduction extended essay how to write freemasonry a philosophical essay viagra en argentina precio https://vgdev.gtorg.gatech.edu/buyonline/can-you-buy-viagra-in-the-us/1/ viagra nursing implications essay about john proctor in the crucible viagra falls band south bend argumentative paper outline template ventolin nombre comercial cambridge application essay follow link how to end the essay pilule du viagra en pharmacie viagra comnect viagra zeitfenster enter Summary of proposed improvements